20 
                            MWp
            
        
         
                    Installed capacity
           
       
          Located in the town of Feriana, within Tunisia’s Kasserine Governorate, this project encompasses two renewable energy developments. The first project is fully owned by Qair, while the second is a joint venture between Qair and Mazarine Energy. Both involve a 25-year land lease and include infrastructure work, such as an access road along an existing track and a grid connection to the STEG substation, located 3 kilometers away. Qair oversees the operations of both projects.